Holiday Operations

Well, as you might expect, the holiday season brought some extra car movements to the BS&T. Fortunately, we were able to call in some extra help to handle the added work. Unfortunately, one employee decided he needed a vacation and high tailed it for a warmer climate. I hope Christmas in Orlando was worth it Derwin!!!

Anyway, we did have two guest operators for the pre-Christmas run. Steve Dickie and Ryan Nelson were on the Island for the holiday and made the trip to Summerside. I think (hope) they enjoyed their time here.

Here are a few pictures from the session…

ryan-in-kenville.jpg

Ryan is running the Kenville switch job.

brian-mark-ryan-ken.jpg

Brian, Mark, Ryan, and Ken (hidden). Ryan has finished his
work in Kenville, for now, so helps Ken out as Brakeman in
Chappellton. Brian runs the Wholeinthall Turn as Mark
builds the East Bound Wayfreight.

greg-steve.jpg

Greg runs the Stevenville switch job as Steve builds the
West Bound Wayfreight.

wayfreight-in-stevenville.jpg

Steve runs the wayfreight through Stevenville. There’s only
a few cars to drop off here, but a few more to pick up heading west.

wcturn-in-chappellton.jpg

The Wholinthall Turn makes it’s way through Chappellton
on its way to Tidewater.

transfer-leaves-bayside.jpg

The Tidewater Transfer makes it’s way out of Bayside.

meet-in-dd.jpg

A moment of confusion as the opposing wayfreights meet
in Derwin’s Drop.

That’s about it for this session. With the extra operator I was able to take a few more pictures than usual.

Until next time!

Scott

Operating Report – Dec. 2, 2007

I had lots of time to prepare for this session, so all locos had clean wheels and bad order reports from the last session were cleared up. The extra preparation resulted in a relatively smooth-running session. So much so we were done in record time!

Bruce Bell and his son popped in during the session so we spent some time talking with him. His son even got to run the return train from Tidewater to Wholeinthall. Bruce better get his layout running soon or he’ll have a revolt on his hands.

Between Bruce’s visit, doing the local switching in Kenville, and providing helper service up and down “The Ridge”, I didn’t get much time to take pictures, but here are a few I managed to take toward the end of the evening.

2007-12-02-derwinsdrop.jpg

Greg running the local job in Derwin’s Drop.

2007-12-02-transfer1.jpg2007-12-02-transfer2.jpg

Derwin gets the helper ready for the Transfer to Bayside.
The Transfer is almost at the top of “The Ridge”.

2007-12-02-transfer3.jpg2007-12-02-transfer4.jpg

The transfer heads through Stevenville.
Brian eases the Transfer into Bayside.

Mark decided he’d give the Stevenville Local Job a try for this session. He picked a good time to try it since it turned out to be the busiest job on the layout. Ha!

Ken took up his usual position in Chappellton. As luck would have it Chappellton turned out to be fairly calm with only half the usual car movements in and out.

Greg ran the West Bound Wayfreight, and the Local Job in Derwin’s Drop. Derwin also did double duty in Tidewater and the East Bound Wayfreight, with a helper job mixed in. He as fairly well behaved during the evening, gaining very few demerit points, for a change.

That’s pretty much it for this session. It was a fun evening. Thanks guys!

Scott

Operating – Nov. 11, 2007

Well, we were short one expected operator, but with 5 it was more than we’ve had on the BS&T in many months.

As usual, jobs were picked on a first come/first pick basis. Mark – the newbie and first to arrive – chose to run the Thumper, the west wayfreight from Tidewater to Bayside. Greg decided to keep his usual job as the local switching in Stevenville/Derwin’s Drop. Ken followed suit and chose the local job in Chappellton. Derwin and Brian arrived at the same time. Derwin chose the Rambler, east wayfreight from Bayside to Tidewater, and Brian ended up with the Wholeinthall and Transfer Turns. I decided to give Ken a hand since he had a lot of work ahead of him by taking the local job in Kenville.

op-1.jpgThe Rambler arrives in Stevenville. Here it will leave cars for the local to deliver and pick up freight heading west.op-2.jpg

For some reason Derwin decided to leave the Stevenville cut on the service track. Unfortunately, the service track wasn’t built for freight cars and the fueling rack was damaged.

op-3.jpgBrian has already run the Wholinthall west into Tidewater and is now busy making up the transfer from Bayside to Tidewater. The transfer will carry freight destined for Wholinthall so it needs to get to Tidewater before the Wholinthall turn departs.

op-4.jpgDerwin had his share of trouble during the op session. He continued his bad luck into Derwin’s Drop. Apparently he overlooked checking turnouts ahead of him while he studied his setout instructions. He very nearly ran his train into a string of cars sitting at the coal mine!

op-5.jpgKen is busy sorting out his orders in Chappellton. He got the short end of the stick this evening. His pickups and drop offs were easily twice as much work as the Stevenville orders. Good thing I took up the slack in Kenville.

op-6.jpgThe West Bound Transfer is rolling through Derwin’s Drop where it must take on a braking helper. The local switcher is picking up that duty since the helper from Kenville is missing an operator (he’s busy railfanning).

op-7.jpgThe braking helper is required so the large freights don’t pick up too much speed going down the grade at The op-8.jpgRidge. It can be quite tricky taking up some of the slack but so so much that the train is “stretched”.

The helper (right) is cut off near the bottom of the grade and returns to Derwin’s Drop.

op-11.jpgop-14.jpg(left) The West Bound Transfer arrives in Tidewater. Now Brian can start breaking it up so he can build the return train to Wholinthall. (right) Power from the Rambler sits in Tidewater waiting for the service facility to be freed up.

op-10.jpgMark drops off a cut of cars for the Stenville Local to put away. We discovered that the Rambler’s luck continued beyond the run into the Mine. He apparently picked up an east bound car from Derwin’s Drop and took it all the way to Tidewater. It was put on the first train departing Tidewater and delivered to op-9.jpgStevenville, late.

The Wholeinthall Turn is making the run home as it heads into Wholeinthall Tunnel. It’s work day is almost done.

The East Bound Transfer needs help getting over The Ridge. Rather than taking the assigned helper the Kenville local hops in front of the lead loco and provides just enough power to get the train up the hill .

op-12.jpgop-13.jpg

All in all it was a very enjoyable operating session. Next week we’ll be operating on Derwin’s Canadisle Rail.

Later!

Scott

Summertime Operating

I guess it’s time to get back into the swing of things. Summer is not over, but I really need to get back into this on-line stuff. It’s been stagnant way too long!

I haven’t done anything new to the layout all summer. At least until this past weekend. I’ve had a PSFour from Tony’s for almost a year. I finally got around to installing it yesterday (sorry no pics of it yet). So far I only have two zones set up, Tidewater Yard, and the rest of the layout. Eventually there will be four zones: Bayside, Stevenville/Derwin’s Drop, Kenville/Chappellton, and Tidewater. The guys noticed a big difference last evening even with only two zones. The biggest difference was not having to press the reset button after a short.

The reason I finally installed the PSFour? UMG’s annual RailFest weekend is this weekend coming and we needed a circuit breaker. So I had to install in on my layout to make sure I knew it worked. And it did, flawlessly, right out of the box.

This year’s RailFest is called “MudFest, since it is being held in the mud capital of eastern Canada – Maitland N.S. We’ve rented a school gymnasium to set up our Free-Mo Style modules and operate the layout all weekend. It should be a blast!

You can see what the layout should look like, provided all the modules show up. There will probably be a module or two constructed at the last minute due to no-shows.

Anyway, back to last evening’s operating session. Summer operations are usually quite a bit different from winter operations in that fewer people attend. There’s usually two or three that have other things come up and one that takes the summer off completely. So, I have created scenarios for operations on the BS&T based on the number of operators on hand. For example if there are only two operators everything is switched by Wayfreights – TuB Rambler (East Bound) and Backwater Crawler (West Bound) and I run the staging train (Wholeinthal Turn) and the Transfer Turn. If there are three operators the third guy runs the two turns and I spend more time helping in yards or with helper service on Devil’s Ridge.

Derwin ran the Wholeinthal Turn last night. Here he is running past Chappellton shortly after departing Wholeinthal. Eventually you won’t be able to see the train running through this area because of buildings and other view breaks in front of the tracks.

Once he arrives in Tidewater he’ll hop in the company van and head to Bayside where he’ll make up the Transfer and run it into Tidewater. Back in Tidewater he’ll have to make up both return trains and run them out to their destinations. He’ll be a busy guy!

(Actually I helped him out a bit and did some sorting and made up part of his trains for him while he was out on the road)

Shawn is one of our summertime regulars. He’s operated with us the past few summers while he is on break from teaching in some exotic places around the world (like Taiwan, the Philippines, and Togo). Here he is getting the TuB Rambler ready for the trip to Bayside. It’s a fairly small train (5 cars) leaving Tidewater, but by the time it gets to Devil’s Ridge it’ll require a helper engine to make the grade up to Derwin’s Drop. He’s got a lot of work ahead of him since he has to pull all the east bound cars in the four towns along the way and put away cars that he has in his train for those towns as well.

Well, the way the evening progressed the Tub Rambler didn’t make it past Stevenville. Here it is parked on the Stevenville work siding. It’ll give me something to do while I wait for the next BS&T operating session in 3 weeks

Unfortunately, I got too busy myself to take many pictures so I don’t have any shots of Greg running the Backwater Crawler. He did make it all the way from Bayside to Tidewater though.

All in all I think it was a great evening for us. I certainly had fun!

Anyway, I’ll post a little something next week about our “MudFest” in Maitland N.S. this weekend. I’ll try to take lots of pictures!

Scott

Picard Packers & Operations

Finally – I have some pictures! The new building for Picard Packers is more or less finished. I still need to do some weathering and scenery work around the building, but here are some pictures of it as it sits now.

The main structure is made from sections of a DPM bulk pack. The rear of the building is just plain matt board since it will “never” be seen. The loading dock shelter is a modified Pikestuff car repair shop.

In an effort to try to make operations as stress free for operators as possible I am trying many different things on the BS&T. In these images you can see two of these things. The first is the multi colored sheet that lists the towns in each direction (East & West) as well as the expected order of trains through the area. The other new item on the valance is the track diagram showing the industries and sidings and their intended purpose. These items should help acquaint new operators with the layout and operations.

Speaking of Operations….

The BS&T saw it’s first operations since I completed service on the nearly 140 freight cars on the layout. The maintenance identified that almost 90% of the freight cars had wheels that were out of gauge, quite a few with trucks that were too tight to the bolster, only a few underweight cars, and a lot of dirty crud. There is a large pile of old wheelsets outside Fixum Car Repair as a result of this process.

As a result of the maintenence process there were certainly fewer derailments, especially at one pesky little spot on Daredevil Ridge. I think the new rule about stopping at the start of the grade and proceeding slow helped there as well. Part of the problem on the ridge was a turnout with points out of gauge. There were a few other derailments in Stevenville with the same cause. I’ll check those turnouts as I install ground throws on them before the next operating session.

The first operators to arrive last Sunday noticed a strange smell in the air. I had just completed wheel cleaning on most of the locos and the smell of rubbing alcohol was fairly strong. Dirty loco wheels was one of the things that caused problems during the last op session and I left it to the last minute, of course.

Well, that’s it for this update. Later!

Scott

Ground Throws & Montain Scenery

Well, after the 1st anniversary operating session on the BS&T I vowed I would install ground throws on all my turnouts before the next op session, before I did any more scenery work. So far all the turnouts in Chappellton and Kenville have ground throws installed (about 30 turnouts). Then I hit a snag. I have no more ground throws! I might strike a deal at the Moncton show, so until then it’s scenery time!

I started at the tunnel coming from staging. The basic land forms were done a few weeks ago so all I add to do was color the earth and add details. This is what it looked like when I started. Pretty bland.

And this is what the area looked like after a few hours of work.

It’s amazing what happens to a picture when you have the white balance settings in the camera wrong. The layout lighting in these two pictures has not changed, but look at the difference with the white balance set for fluorescent (left) and auto (right).

The long grass is an idea I got from Harold Minkwitz. It is faux-fur from Wal-Mart dyed with Dye-Na-Flow fabric paint.

I’ll be getting ready for the train show in Moncton next week so I’m not sure if I’ll have an update. I will next week though with some pictures from Moncton, at least.

Scott

1st Anniversary Op Session

Last Sunday evening marked the 1st anniversary of operations on the BS&T. The week previous was a mad rush to get things back together and cleaned up from two months of scenery and rearrangement work. Add to that figuring out how operations would work with the addition of the new staging area.

First of all I must apologize for not getting any pictures from the evening. Between trying to figure out the operating scheme, helping the operators figure out the operating scheme, and running a train once in a while, I didn’t have much time to take pictures.

So, here’s the train/job line-up:

Bayside Yard
Tidewater Yard
Stevenville Local
Chappellton Local
Kenville Local
Derwin’s Drop Local
Hotshot Freight (turn)
East/West Transfer (turn)
East Wayfreight
West Wayfreight

Things went fairly well, overall. There were a few track issues. Not all the ballast was cleaned up through some turnouts which caused a few problems until it was cleaned out. The over-center springs on some turnouts are a little weak. I will be adding proper ground throws to most turnouts over the next little while (as of last evening, all the turnouts in Chappellton have ground throws).

Early on in the session the Chappellton switcher developed some mechanical difficulties and a replacement loco was called in from Kenville. The repair crew had a look at it on Monday, fixed the problem, and moved the replacement back to Kenville.

The operating scheme must change to reduce the minimum number of operators required. Actually, I think I’ll have a couple scenarios I can use depending on the number of operators that show up. I’ve got it down to as few as 4 people (4 very busy people), or as many as 8 (16 with brakemen).

Anyway, at the post-session review the guys said they had a great time. The things they said they would change were mostly related to turnouts that the ground throws should fix.

So, until next time!

Scott

Operating on the BS&T – July 9, 2006

We’re almost caught up to present day. These photos are from an operating session held over the past summer. The crew is pretty slim in the summer and guest operators help to round things out.

Derwin tries to keep up with things in Tidewater
as Shawn makes his way to Chappellton.

Greg checks out yard operations. Shawn works
in Chappellton.

Shawn’s very busy at the far end of
Chappellton. Derwin’s trying not to break
anything.

A closer look at Chappellton.

Next time – the guys are itchy to get a start on scenery!

Later!