Operating at Clayton’s

After an almost 2 year vacation from model railroading Clayton decided it was time to come back.  We spent last Sunday evening there repairing some of the damage that mysteriously appeared since we last operated there.  The list of repairs included the “lift out” bridges, cleaning the track, and replacing the rolling stock on the layout.

We’ll be operating there this evening.  But first we have to put all the freight cars back to where they were, or at lest where the computer expects them to be.  It should be a fun evening – almost like operating on a new layout.

I’ll post some pictures later in the week.

Scott

Posted in General.